How We Boosted Food Production Capacity While Our Client Remained Fully Operational

Share

A producer of high quality deli meats, cheeses and condiments needed to expand and renovate a 500,000-square-feet, existing food production facility in Jarratt, VA and save energy in the process. All this would need to be accomplished while remaining fully operational.

The designers, engineers and construction experts at A M King had their work cut out for them.

Because the facility could not shut down while we worked, we developed a logistics plan that included 24/7 supervision and mission critical food barrier practices to allow construction to take place. We then installed specialty floor slabs, dropped ceilings from 20 feet to 15 feet to save energy in the food storage area and organized a state-of-the-art ammonia refrigeration system. The new drive-through dock operations allowed for greater thermal control in the new dock facility as well.

The benefits to the customer were numerous. First and foremost was the 30 percent increase of meat product production and the ability to turn out multiple proteins concurrently. The company also increased its refrigeration capacity by 100 percent, doubled its shipping and receiving capabilities and expanded product storage by 25 percent. They also enjoyed a surge in overall efficiency, improved product flow and greater incoming electrical service.

A M King’s turnkey design, engineering and construction was a recipe for success.


A M King Staff
A M King Staff
Related Posts
READ MORE
Aug 8, 2022 • CORPORATE
Tips for Employing Insulated Metal Panels

John Koury, consulting architect for A M King, teamed up with Dean Soll, TrueCore co-founder and Open Concepts…

READ MORE
Jul 7, 2022 • CORPORATE
Design-Build with Digital Twins

While “digital twins” will likely never be part of my typical lexicon, the technology is finding its way…

Matt Worley's family. From left, brother Justin Worley; mother Angela Worley; and father Peyton Worley.
READ MORE
Jun 7, 2022 • CORPORATE
How I Discovered a Rewarding Career in Design-Build

Like many college freshmen, I didn’t have a clue what I wanted to do with my life. When…

READ MORE
May 5, 2022 • CORPORATE
Let’s Talk About Building Strong Client Relationships

There’s a lot at stake when you’re running another complex expansion job for billion-dollar broadline food distributor Cheney…

READ MORE
Apr 4, 2022 • CORPORATE
How to Renovate Corporate Office Space in 2022

I had an interesting conversation with an electrochromic glass rep recently. I was supervising installation of the product…

READ MORE
Feb 15, 2022 • CORPORATE
A M King’s ASC Competition Sponsorship Benefits AEC Students

My draw to construction has always been about the tangible results. I like being able to say, “See…

Subscribe To Our Blog

SUBSCRIBE TO OUR BLOG

This field is for validation purposes and should be left unchanged.