GE Vernova Lean Lines

In year one of lean lines at GE Vernova’s Greenville, SC manufacturing facility, gas turbine development lead time decreased by approximately 50 percent.

MARKET

Industrial Manufacturing

LOCATION

Greenville, SC

SERVICES

Design
Construction
Facility Services

SPECIFICS

  • 30 – 50 machines per production line
  • Utility modifications to include power, water, air, gases, lubricants
  • Affected area:  5,000 – 10,000 sf of existing manufacturing space
  • 300 – 600 lf of utility distribution rack
  • Project duration: 4 – 8 weeks

Historically, it has taken GE 76 weeks to build a turbine. Realizing the goal of 26 weeks would require a partner that could work quickly and safely to assist in the development of a premier series of lean lines. The ultimate objective was to more efficiently manufacture the blades in the combustion section of the gas turbines, reducing waste associated with processing, waiting, motion, inventory, moving equipment, over-production and defects. Utilizing prefabrication throughout the process accelerated schedules and limited safety concerns in the field.