How We Boosted Food Production Capacity While Our Client Remained Fully Operational

Share

A producer of high quality deli meats, cheeses and condiments needed to expand and renovate a 500,000-square-feet, existing food production facility in Jarratt, VA and save energy in the process. All this would need to be accomplished while remaining fully operational.

The designers, engineers and construction experts at A M King had their work cut out for them.

Because the facility could not shut down while we worked, we developed a logistics plan that included 24/7 supervision and mission critical food barrier practices to allow construction to take place. We then installed specialty floor slabs, dropped ceilings from 20 feet to 15 feet to save energy in the food storage area and organized a state-of-the-art ammonia refrigeration system. The new drive-through dock operations allowed for greater thermal control in the new dock facility as well.

The benefits to the customer were numerous. First and foremost was the 30 percent increase of meat product production and the ability to turn out multiple proteins concurrently. The company also increased its refrigeration capacity by 100 percent, doubled its shipping and receiving capabilities and expanded product storage by 25 percent. They also enjoyed a surge in overall efficiency, improved product flow and greater incoming electrical service.

A M King’s turnkey design, engineering and construction was a recipe for success.


A M King Staff
A M King Staff
Related Blogs
The Secret to Exceptional Sanitary Design by Tyler Goodwill.
READ MORE
Apr 8, 2024 • CORPORATE
The Secret to Exceptional Sanitary Design

What is the secret to exceptional sanitary design for a complex food processing facility? I could say it’s…

READ MORE
Mar 11, 2024 • CORPORATE
A M King’s 20th Anniversary:
10 Achievements That Define Us

We are celebrating A M King’s 20th Anniversary this year. While we have arrived at this milestone moment,…

READ MORE
Feb 12, 2024 • CORPORATE
A Career in Design-Build: From Intern to Project Manager

At A M King, there are great opportunities for advancement. When I was promoted to Project Manager, I…

Smart Design-Build Solutions for a USDA-Certified Food Facility
READ MORE
Nov 7, 2023 • CORPORATE
6 Design-Build Solutions for a USDA-Certified Food Facility

A great client success story never goes out of style, especially when the subject, Southern Foods, is a…

Controlled-temperature facilities
READ MORE
Sep 12, 2023 • CORPORATE
A Very Cool Conversation about Controlled-Temperature Facilities

If you’re a cold foods manufacturer, what is your No. 1 challenge? Is it food safety, facility efficiency,…

READ MORE
Jul 11, 2023 • CORPORATE
How We Design-Build Better

Your business has optimized and utilized its existing space, but still more room is needed, maybe even a…

Subscribe To Our Blog

SUBSCRIBE TO OUR BLOG

This field is for validation purposes and should be left unchanged.